Bedford High School
|
|
| This project consists of renovations of 180,000 square feet of the existing building. Renovation includes demolition of existing building systems and installation of new fire sprinkler system, plumbing systems and fixtures, heating and ventilation systems; selective air conditioning; and new electrical system. 40,000 square feet of new construction; additions include an addition to the front of the building which contains an entrance lobby, administrative office space and the library, an addition at the rear of the building containing general classrooms, science classrooms, a large group construction room, and a computer lab, an addition of the Gymnasium wing which contains a corridor with rear addition, and an addition to the connector between the two wings for a new elevator and stair. |
|
|
|